Siemens SOMATOM Definition AS
64-slice CT installation, calibration, PACS integration and operator training.
Explore projectA coordinated installation process, from site readiness and system assembly to testing, integration and technical handover.
Positioning, assembly and start-up are only the beginning. The system leaves our hands calibrated, connected to PACS and documented, with the operators trained on it.
Verify power, UPS, cooling, cable routes, system interfaces, network connections and equipment access before installation.
Position and assemble the system, complete its connections, configure workstations and network settings, and support initial start-up.
Complete functional and safety checks, verify imaging and PACS/DICOM connectivity, and prepare technical handover records.
Define the scope, review drawings and coordinate contractors, installation planning, site follow-up and acceptance testing for complex imaging projects.