Cryogenic assessment, controlled de-energization and technical dismantling.
Explore projectA planned technical transition for your imaging system, covering assessment, dismantling, protection, transport coordination and reinstallation.
Relocation is where equipment gets damaged and configurations get lost. Our sequence protects both: backups before shutdown, controlled de-energization where a magnet is involved, labelled packaging and a verified restart.
Assess equipment condition, access routes and destination readiness, with configuration backups and a review of relocation risks.
Coordinate shutdown, technical dismantling, component identification, protective packaging and transportation.
Reassemble and start the system, carry out functional and calibration checks, restore PACS/DICOM settings and verify readiness for service.
Access routes, floor loading, power and room readiness at origin and destination.
Configuration saved; controlled de-energization for MRI, with Civil Defense and vent checks.
Components labelled, protected and loaded with the transport plan agreed.
Reassembly, calibration, PACS restore and phantom imaging before release.